Home › Industries › HVAC

HVAC company financing for the shoulder months, the refrigerant changeover and the next van

An HVAC company's busiest weeks arrive with the heat and the cold, and its payroll arrives every week in between. Here is where that leaves cash short, which kind of funding is built for each gap, what EPA's refrigerant rule changes, and when the cheaper move is to wait.

Independent referral service, not a lender or anyone's agent. If you're funded, the funding company may pay us a referral fee, which is part of the price you pay. We never charge you a fee. How we get paid.

An HVAC technician checks refrigerant gauges on an open rooftop air conditioning unit
  • Slow stretchThe mild spring and fall weeks between the cooling and heating peaks
  • Rule changeRefrigerant GWP limit of 700 for new home and light-commercial systems from 2025
  • Paid laterProperty managers and contractors who pay on invoice terms
  • Big ticketsService vans, recovery machines and A2L-rated tools

How cash moves through an HVAC company

Heating and cooling work follows the weather. The Bureau of Labor Statistics notes that technicians can end up on call for emergencies and working overtime or odd hours when the heating and cooling peaks hit. The mild weeks between those peaks are the other side of the year: fewer breakdowns and fewer replacements, but the same trucks, insurance, rent and crew.

Money comes in on three clocks:

  • Homeowners usually pay when the repair or install is finished, so residential cash tracks the calendar of calls.
  • Commercial customers such as property managers, general contractors and building owners pay invoices on terms, so a busy July can still be sitting in your receivables in September.
  • Maintenance agreements bring smaller, steadier payments that soften the slow months without filling them.

So the gap is not one big hole. It is a few predictable weeks each spring and fall when payroll keeps running and calls do not, plus whatever commercial customers still owe from the last peak. Your own deposits over the last two years show which weeks those are in your market; the local weather sets them, not a national calendar. Contractors who work under general contractors on new buildings also deal with pay applications and retainage, which the construction page covers.

Sources: U.S. Bureau of Labor Statistics: Heating, air conditioning, and refrigeration mechanics and installers (Occupational Outlook Handbook).

The refrigerant changeover, in EPA's own terms

EPA's Technology Transitions rule sets, sector by sector, a ceiling on the global warming potential (GWP) of the refrigerant in new equipment. For residential and light-commercial air conditioning and heat pump systems, such as mini-splits and unitary systems, the cap is a GWP of 700 for systems manufactured or imported from January 1, 2025. EPA's table adds that there is "No installation compliance date for systems where all specified components were manufactured or imported prior to January 1, 2025", so equipment built before that date can still be installed.

Two more lines in the same table matter to commercial contractors. Variable refrigerant flow (VRF) systems face the 700 limit from January 1, 2027, and EPA's notes set installation deadlines for higher-GWP VRF systems that depend on when their components were made and when the building's permit was issued. Chillers used for comfort cooling have carried the 700 limit from January 1, 2025. EPA also says components used to repair existing systems are not subject to these restrictions, so service work on older equipment carries on.

The new refrigerants come with conditions of their own. Among the substitutes EPA lists as acceptable for these systems are HFC-32, with a GWP of 675, and R-454B, with a GWP of 470; both carry the A2L safety class, and EPA lists them as acceptable only with use conditions. BLS adds that EPA requires nearly all HVAC technicians to be certified in proper refrigerant handling. Before you count on your current recovery machines, vacuum pumps and leak detectors, ask your distributor which of them are rated for A2L refrigerants.

What it does to cash: equipment built before 2025 can still be sold and installed, so the question for stock on hand is how fast to sell through it, not whether it is stranded. New equipment, the tools to work on it and the training all want cash in the same season. None of that is a reason to stock up on a guess. It is a reason to plan tools and training alongside the vans.

Sources: EPA: Technology Transitions HFC restrictions by sector (last updated August 28, 2026); EPA SNAP program: substitutes in residential and light commercial air conditioning and heat pumps; U.S. Bureau of Labor Statistics: Heating, air conditioning, and refrigeration mechanics and installers (Occupational Outlook Handbook).

HVAC contractor financing: four gaps and the structure built for each

GapWhat it looks likeBuilt for itWatch for
Shoulder-season payrollCalls drop for a few weeks in spring and fall; the crew stays onA business line of credit, drawn in the trough and paid down in the peakAnnual or draw fees, and a balance that never gets back to zero
Vans and toolsA new service van, its shelving and an A2L-rated recovery machineEquipment financing or a lease, secured by what it buysA term longer than the van's working life, or a balloon payment at the end
Commercial receivablesProperty managers and general contractors paying on invoice termsInvoice factoring of invoices for finished workRecourse terms, minimum volumes and a fee that runs while the invoice is open
Buying another companyA retiring owner's customer list, trucks and techniciansAn SBA 7(a) loan, which can fund a change of ownershipWeeks to months of underwriting, and a personal guarantee

A revenue-based advance can also cover a short gap, repaid as a share of your deposits. Its total cost is fixed when you sign, however quickly the summer repays it, which makes it the costly way to fund a gap you can see coming. Keep it for a spring that goes wrong, not as the plan. The line vs loan vs advance guide sets the three side by side.

Sources: SBA: 7(a) loans (uses include changes of ownership, complete or partial).

A worked example: a slow April and a new van

The figures below are an example, not an average or a quote. Take a contractor with eight technicians and costs of about $95,000 a month. In a normal shoulder season its March and April deposits come to about $70,000 each, so each of those months runs $25,000 short.

With a line of credit. The contractor draws $25,000 on March 1 and $25,000 on April 1, then repays the $50,000 on June 30 from cooling-season work. At an example 12% a year, each $25,000 drawn costs about $250 a month: four months on the March draw and three on the April draw, about $1,750 in all, plus any draw or annual fee in the agreement. If property managers pay the July invoices late and the balance waits until August 31, interest rises to about $2,750.

With a revenue-based advance. The same $50,000 at an example repayment multiple of 1.25 means $62,500 comes back out of deposits: a cost of $12,500 whether summer arrives early or late.

The van. A $58,000 van with $12,000 of shelving, a recovery machine and A2L-rated tools is a $70,000 purchase. Financed over 60 months at an example 12% a year, the payment is about $1,557 a month, which works out to about $74 for each of 21 working days. That is the gross margin the van has to bring in every working day just to carry itself. Try your own figures in the equipment payment calculator, and count the days between paying your crew and collecting from customers in the cash gap calculator.

The difference between about $1,750 and $12,500 is the case for opening a line before the slow season. The funding company's published minimums for a line call for more time in business than an advance does (at least 1 year against 6 months) and a higher credit minimum, and draws on an open line usually reach your account in one to two business days, so the line has to be in place before March, not applied for in it.

What the funding company looks for in an HVAC contractor

The application with the funding company we refer you to asks for your business bank statements: the last four months, as PDFs, along with the business's EIN and start date and each owner's details. For an HVAC company the statements show whatever season you are in, so four months that run from a busy summer into a quiet fall give a fuller picture than four quiet months on their own.

Minimums for time in business and revenue differ by product, and the exact figures, as the funding company publishes them, are in the box on each funding-type page: line of credit, equipment financing and invoice factoring. With factoring, the funder looks hard at your commercial customers and their payment record, not only at you.

The funding company says its first credit check is a soft pull that does not affect your score, and that a hard inquiry comes only at the final funding step, after you accept an offer. Expect a funder to ask for a personal guarantee, and expect equipment financing to come with a lien on the van or tool it pays for. We never charge you a fee; if you are funded, the funding company may pay us, and that fee can be part of what the funding costs (see how we get paid). When you are ready, start the application, which checks your state first.

Where we can refer an HVAC contractor

We refer businesses only. A program that lets your customers pay for a new system over time is consumer financing, and it is not something we refer.

An HVAC company based in Texas, Virginia, North Dakota or (for now) Florida is outside the states we refer from, whatever the product. In Connecticut and Missouri we do not refer revenue-based advances or merchant cash advances, which leaves a line, equipment financing, factoring or an SBA loan. In California we can refer only non-recourse factoring of invoices already issued, which for an HVAC company means invoices to commercial customers for finished work. The details are on state availability and California.

When an HVAC company should not borrow

  • When supplier credit will do. Ask your distributor about extended payment terms on preseason orders before you borrow for stock; trade credit can cost less than anything on this site.
  • When the problem is a bad year, not a slow season. A line works for a trough that ends on a known date. If calls have been falling for a year, borrowing pays this month's payroll with next year's margin.
  • To stock up ahead of the rule. Buying extra pre-2025 equipment on a guess about prices is a bet, and borrowed money makes a wrong guess more expensive.
  • When a second advance would pay off the first. That is stacking, and the red flags guide explains why it goes wrong.
  • When a bank or SBA lender can say yes in time. SBA's Seasonal CAPLine finances seasonal increases in receivables and inventory, and in some cases the extra labor that comes with them. It moves on a bank's timeline, so it suits a contractor who plans a season ahead; the free and low-cost alternatives guide shows where to start.

Sources: SBA: lender resources, including CAPLines and the Seasonal CAPLine.

Common questions

When is the real slow season for an HVAC company?

It is the mild weather between your cooling and heating peaks, usually some weeks in spring and fall, but the exact weeks depend on your climate and on how much of your work is commercial. Your own deposits over the last two years are the best map. Arrange any funding before the first slow month, not during it.

Can I finance a van together with its shelving and tools?

Equipment financing can cover a vehicle and the equipment fitted to it as one package, secured by what it buys. Ask the funder to list the upfit on the agreement, so the shelving, ladder racks and recovery machine are not left to a separate and costlier loan. Check that the term ends before the van leaves service.

What does the refrigerant rule change for my inventory?

Systems whose components were all made or imported before January 1, 2025 can still be installed, so stock on hand is not stranded. New residential and light-commercial systems have to meet the lower GWP limit, and VRF systems follow from 2027. The refrigerant section above links EPA's table; read it before you buy, and do not borrow to stock up on a guess.

Can I factor invoices to property managers?

In principle, yes: invoices to businesses for finished work are what factoring is built for, and the funding company's factoring is for invoices owed by businesses or government agencies. The factor will look at how reliably the property manager pays, and homeowner invoices are not part of it. Run the numbers through the invoice factoring cost calculator before you sign.

Do you finance my customers' installs?

No. We refer businesses for the business's own needs: payroll, vans, tools, receivables or buying another company. Programs that let a homeowner pay for a new system over time are consumer financing, and we do not refer them.

Can I finance buying another HVAC company?

An SBA 7(a) loan can be used for a change of ownership, and it is the long-term route for a purchase, though it takes weeks to months. Equipment financing can cover trucks and tools that come with the deal, and the business loan calculator shows what a purchase loan costs a month. A business in California is outside this route, because there we can refer only non-recourse factoring.

Ready when you are

Check that we can refer a business in your state, see what to have ready, then apply once with the funding company. Decisions can come in as little as 24 hours, and some businesses are funded as soon as 24 hours after approval. Timing isn't guaranteed: it depends on the product and on your file.

Independent referral service, not a lender or anyone's agent. If you're funded, the funding company may pay us a referral fee, which is part of the price you pay. We never charge you a fee. How we get paid.

CallStart your application